CCG Facilities Integration

Innovating Mission Critical Systems

News Article

Data Foundry Construction Blog

11.24.2010

Please follow the Data Foundry team on its new blog series www.datafoundry.com/blog which showcases the construction of the Data Foundry’s new $150 Million, 250,000 SF Austin Data Center 2 (ADC2) Facility.

Residing on the 40-acre Data Ranch campus capable of over 1 million square feet of data center space, ADC2 is designed with redundancy at every level – power, water, utilities, and IP connectivity. Referred to as a “data dream home”, the ADC2 will house servers, store data and provide IT backup and disaster recovery for companies on both a local and global level.

CCG Facilities Integration, as the Engineering consultant, provided the following services:

  • Concept Design
  • Engineering Construction Documents
  • Construction Administration

Latest News