Cover Page printable version
Abovenet Communications
VA-3 ISX
America Online
Manassas Technology Center
Abovenet Communications
NJ-1 ISX
Terremark
NAP of the Americas
America Online
Dulles Technology Center
US DataPort
Virginia Gateway Campus
United States
Patent and Trademark Office
FannieMae
Primary Data Center
Guardian IT Group
Trading Recovery Center
21 Vianet China
Beijing-3 Internet Data Center
Abovenet Communications
Dublin-1 ISX
our mission capabilities principals contact us

Abovenet Dublin-1

The AboveNet Communications Dublin-1 Internet Service Exchange is their first and anchor facility in Ireland. This facility houses co-location operations supported by a highly resilient electrical and mechanical systems infrastructure. The two story purpose built structure contains co-location equipment rooms, technical support operations, and facility infrastructure equipment.

Supported by a hybrid electrical plant utilizing multiple unit, battery-less rotary UPS systems and conventional engine generators, this facility establishes a new benchmark in cost effective, reliable critical electrical infrastructure design. Cooling is provided by a central air-cooled chilled water plant. All critical support systems are configured for maintainability without interruption of computer operations.

The facility also houses a Network Operations Center and Marketing Support Center, and is located in the CityWest National Digital Park.

Services provided:

CCG Facilities Integration, as the data center facility consultant, provided the following services:

  • Concept and Schematic Design (with Notari
        Associates)
  • Design Advisory for construction documents
  • Long Lead Equipment Specification Support/Review
  • Commissioning Support

    Local Design Consultants of Record:

  • James Smyth Architects (Architecture)
  • MEIT Associates (Mechanical/Electrical Engineering)
  • Project statistics:

  • Total Building Area: 115,000 SF
  • Cooling Plant: 2,500 Tons
  • Electrical Service: 14 MVA
  • Emergency Power: 18 MW
  • UPS System Capacity: 8 MW
  • N+1 redundancy of primary systems



    Contractors:

  • StructureTone (General)

  • CCG Facilities Integration Incorporated