Cover Page printable version
Abovenet Communications
VA-3 ISX
America Online
Manassas Technology Center
Abovenet Communications
NJ-1 ISX
Terremark
NAP of the Americas
America Online
Dulles Technology Center
US DataPort
Virginia Gateway Campus
United States
Patent and Trademark Office
FannieMae
Primary Data Center
Guardian IT Group
Trading Recovery Center
21 Vianet China
Beijing-3 Internet Data Center
Abovenet Communications
Dublin-1 ISX
our mission capabilities principals contact us

US DataPort

The Virginia Gateway Campus is the second major development effort of US DataPort, with a third to follow. US DataPort's objective is the development and operation of technology facility campuses supported by on-site highly reliable centralized power and cooling cogeneration plants.

US DataPort's strategy is to provide unique advantages to large data center users, including accelerated time to market; below market electric power and cooling costs; reliable power and cooling supplies due to on-site cogeneration; cost-effective, reliable and diverse access to multiple high bandwidth service providers; an extremely secure physical environment; and a broad range of development methodologies for facility construction.

The major elements of this development include the central reliable energy and cooling plant, two centralized telecommunications and site management support facilities, and as many as twelve freestanding technology center facilities. Over 2.3 million square feet of technology floor area is planned for the 192 acre site.

Services provided:

CCG Facilities Integration, as the data center facility consultant, provided the following services:

  • Proof of Concept Engineering and Master Plan Design
  • Programming and Concept Design for
        Telecommunications and Site Management Facilities
  • Cogeneration Plant Design Advisory
  • Brand Imagery and Approach
  • Project statistics:

  • Total Building Area: 2,300,000 SF
  • Cooling Plant: 80,000 Tons
  • Primary Emergency Power: 250 MW
  • UPS System Capacity: 150 MW
  • N+2 redundancy of primary systems